Production, transport and assembly of steel structures for a chemical factory production facilities with the corresponding service structures. The largest facility included the 71–72 production of polyester polyols shop, with the weight of 1 520 t and Anilin plant for the production of aniline, the weight of which was 1 534 t. Modification of the manufacturing documentation due to the inclusion of details necessary for the correct implementation of surface treatments was also a part of delivery.
Production, transport and assembly of hot-dip galvanized steel pipe bridge structures on a chemical factory premises, with longest bridge stretching 550 m. Modification of the manufacturing documentation due to the inclusion of details necessary for the correct implementation of the hot-dip galvanizing process was also a part of delivery.