Biomass boiler plant Fjernvarme, Denmark

Production, transport and assembly of steel structure for a biomass boiler plant with floor plan dimensions of 35.5 x 37.2 m, 43-m high, and the corresponding service steel structures. In essence, the work consisted of replacing all steel structures with new ones, while the supporting reinforced concrete framework of the existing boiler plant was preserved. Part of the work supplied was the manufacturing documentation for the secondary steel structures of railings, floor grates and floor plates.

Year of execution
2022
neprelozene Investor
Fjernvarme Fyn
Purchaser
Andritz Oy
Weight of steel structures
1380 t
PROJECTS

WE WILL TURN YOUR DREAMS INTO REALITY

Sandersdorf-Brehna, Germany
Boiler BFB PROGROUP, Germany
Oulu, Finland
Power boiler SE O750, Finland
Sanen Luxembourg
Kronospan CHP3 regeneration boiler plant,
Ivachnová, Slovakia
Construction of Ivachnová mall
Kemi, Finland
Regeneration boiler plant
Frovi, Sweden
Regeneration boiler plant BillerudKorsnäs,
Fjernvarme, Denmark
Biomass boiler plant
Bratislava, Slovakia
New construction and partial rehabilitation of the H1 Volkswagen welding plant in
Tampere, Finland
Biomass boiler plant Naistenlahti 3
Husum, Sweden
Boiler plant of Metsä Board recovery boiler