Biomass boiler plant Naistenlahti 3 Tampere, Finland

Production, transport and assembly of steel structure for the Naistenlahti 3 (NSL3) biofuel boiler with floor plan dimensions of 54 x 27 m, 52.5-m high and the related service steel structures and pipeline bridges. By sharing 3D BIM models with the general designer of Sweco AB, we developed the manufacturing documentation of the secondary steel structures of railings, floor gratings and floor plates.

Tampereen Sähkölaitos is an energy group producing power from renewable sources and actively developing future energy solutions in Finland. Through systematic development, the company has been reducing CO2 emissions from power production and, with almost 400 professional employees, creates jobs for people from the neighboring regions.

Year of execution
2020-2021
neprelozene Investor
Tampereen Sähkölaitos Oy
Purchaser
Valmet Technologies Oy
Weight of steel structures
1880 t
PROJECTS

WE WILL TURN YOUR DREAMS INTO REALITY

Sandersdorf-Brehna, Germany
Boiler BFB PROGROUP, Germany
Oulu, Finland
Power boiler SE O750, Finland
Sanen Luxembourg
Kronospan CHP3 regeneration boiler plant,
Ivachnová, Slovakia
Construction of Ivachnová mall
Kemi, Finland
Regeneration boiler plant
Frovi, Sweden
Regeneration boiler plant BillerudKorsnäs,
Fjernvarme, Denmark
Biomass boiler plant
Bratislava, Slovakia
New construction and partial rehabilitation of the H1 Volkswagen welding plant in
Tampere, Finland
Biomass boiler plant Naistenlahti 3
Husum, Sweden
Boiler plant of Metsä Board recovery boiler