Production, transport and assembly of the steel structure for the regenerative boiler plant. The steel structure’s dimensions were 39 x 29.5m and it was 60 m high. The steel structures of service buildings and pipeline bridges were also part of the project. As part of the work supplied, we produced the manufacturing documentation of the secondary steel structures of railings, floor gratings and floor plates.