Production, transport and assembly of the 45 x 45 m, 85-m high regeneration boiler steel structure and the corresponding service steel structures and the ESP (electrostatic precipitators) and the SAP (sulphur acid production) facilities. Part of the work supplied was also manufacturing documentation for the secondary steel structures of railings, floor gratings and floor plates.